Recent Base Metals Mine Consulting Projects:


2015 Open-pit Project
Copper, Gold, and Silver

Grasberg/PTFI Mines - Freeport McMoRan Inc. , Papua, Indonesia
Ore Reserves, Mine Planning, Capital and Operating Costs. Annual review of the ore reserves. Mine to Mill reconciliations

Pinto Valley - Capstone Mining Corp. , Arizona, USA
Mine Strategic Planning, Equipment and Capital Costs for A mine Feasibility Study

Safford Mine - Freeport McMoRan Inc. , Arizona, USA
Resource and Reserve Verifications, Review of Phase Designs

NorthMet Project - PolyMet Mining Inc. , Minnesota, USA
PEA Report for North Star, Update of Mine Plans

Curipamba Project, El Domo Open Pit - Adventus Zinc. , Bolivar and Los Rios Provinces, Ecuador
Estimate Capital and operating cost for alternatitive production rates, ran pit optimization for expansion possibilities

Sonora Lithium Project - Bacanora Minerals Ltd. , Sonora, Mexico
Development of Resource and Reserves, Mine Strategic Planning, Equipment and Capital Costs for a Mine Feasibility Study

Sierrita Mine - Freeport McMoRan Inc. , Arizona, USA
Resource and Reserve Verifications, Phase Design, and Production Scheduling, Detailed evaluation of strategic operating plan including alternative haulage systems. Mine phase design and production scheduling to determine strategies to operate at different copper price levels.

Ray Mine - Asarco LLC, Arizona, USA
Mine Planning for Long Term Mine Assessment.

Rosemont Copper - Hudbay Minerals Inc. , Arizona, USA
Detailed evaluation of strategic operating plan including alternative mine phase design and production schedules to determine alternative throughput mining rates.

Copper Flat - THEMAC Resources, New Mexico, USA
Resource Modeling, Mine Design and Dump Planning, NI 43-101 Declaration of Reserves, and Detailed Mine Planning

Chino Mine - Freeport McMoRan Inc. , New Mexico, USA
Resource and Reserve Verifications, Review of Phase Designs

Malpica - Grupo Mexico, Sinaloa, Mexico
The resource model will be compared with the drilling data to make sure the model is reasonable, A floating cone analysis will be done to assist with final pit design and the design of mining phases, Waste storage areas will be determined and designed

Chillito Project - Asarco LLC, Arizona, USA
Review and Verification of Reserves Status and Resources

Navidad - Pan American Silver Corp., Chubut, Argentina
Resource Model Development and Mine Planning.

King-King - MDC America Inc., Mindanao, Philippines
Originally for Russel Mining and Minerals, Inc. Development of Resource and Reserves, Mine Strategic Planning, Equipment and Capital Costs for a Mine Feasibility Study

Altar Project - Stillwater Mining Co. , San Juan, Argentina
Update of the Mineral Resource Estimate and Scoping Study for Potential Production and Infrastructure Development

Las Chancas - Southern Peru Copper Corp., Apurimac, Peru
Detailed Phase Design and Mine Schedules for Alternative Haulage Systems (truck haulage versus crush and convey). Scoping Level Mine Feasibility Study

Marathon Project - Stillwater Mining Co. , Ontario, Canada
Mine planning assistance

Cordero - Levon Resources, Ltd., Chihuahua, Mexico
Preliminary Economic Assessment Study (PEA)

MacArthur Project - Quaterra Resources Inc., Nevada, USA
Preliminary Economic Assessment Study (PEA)

Resolution Copper - Resolution Copper Mining, Arizona, USA
Underground drill hole spacing study that will result in resources that minimally qualify for indicated mineral resources

Mexican Hat - GMV Minerals Inc. , Arizona, USA
mine planning and mine cost estimation component of a PEA